Square footage
Gut renovations are priced per square foot, so 1,000 vs 2,000 sq ft roughly doubles the structural, MEP, and finishes scope.
Independent 2026 per-square-foot gut renovation pricing across Queens — what drives it, when you need an architect, and free estimates from licensed local contractors.
Gut renovations are priced per square foot. Ranges below reflect typical pricing from licensed contractors across Queens. Final cost depends on the age and condition of the building and the finish level.
A 1,500 sq ft home typically runs $225,000–$450,000+ depending on tier. Pre-1980 buildings often need asbestos or lead testing, and NYC gut renovations almost always require an architect to file plans with the DOB.
Gut renovations are the biggest residential scope there is — these six factors decide where you land per square foot.
Gut renovations are priced per square foot, so 1,000 vs 2,000 sq ft roughly doubles the structural, MEP, and finishes scope.
Rewiring, new plumbing stacks, and HVAC to bring older Queens homes up to current code is a major cost center.
Removing load-bearing walls (needs beams and filed plans), moving stairs, or opening up the floor plate adds engineering and permit work.
NYC gut renos almost always need a licensed architect or engineer to file with the DOB, plus work permits for structural, plumbing, and electrical changes.
Pre-1980 NYC homes often contain asbestos (pipe insulation, floor tile) or lead paint. Testing and professional abatement add time and cost.
Basic, mid, and luxury finish packages swing the per-sqft price widely — cabinetry, flooring, tile, and fixtures are where most homeowners personalize and where budgets flex.
Real gut renovations by licensed local contractors. Removing walls and modernizing layouts is where the biggest transformations happen.
Before
AfterThree steps, all free. We connect you with a vetted Queens remodeling contractor — you decide whether to move forward.
Share your borough, size, what you want to change, and your rough budget. Takes about two minutes.
A licensed and insured Queens contractor experienced in gut renovations reaches out to schedule a free on-site estimate.
Review a written, itemized quote with scope, timeline, and payment schedule. No obligation, no pressure.
Queens Reno Guide is an independent resource — not a contractor's sales site. We publish real local cost data so homeowners can plan realistically, then connect you with a licensed contractor when you're ready.
Typical 2026 pricing runs about $150–$200/sq ft for a basic gut, $200–$275/sq ft mid-range, and $275–$400+/sq ft for luxury. A 1,500 sq ft home usually totals $225,000–$450,000+ depending on condition and finishes.
In NYC, almost always — a licensed architect or professional engineer must file plans with the Department of Buildings for structural, plumbing, electrical, and layout changes.
Plan on 3–9 months total: design and filings 1–3 months, construction 2–6 months depending on scope, plus inspections and finish work. NYC permit and DOB sign-off timelines add several weeks.
Yes. Gut renovations expose the building to the studs — no working plumbing, electrical, or heat for much of the project. Most homeowners arrange alternate housing for the construction period.
Pre-1980 buildings commonly contain asbestos around pipes, boilers, and floor tiles, and lead paint on trim. A licensed contractor tests before demo and, if found, uses certified abatement — required by law and protects your family and workers.
If you change the number of dwelling units, occupancy type, or major structural layout, the DOB may require a new or amended Certificate of Occupancy. Cosmetic and same-use gut renovations usually keep the existing CO with filed work permits.
Queens Reno Guide publishes local cost data and connects homeowners with licensed contractors across Queens, New York.
Tell us about your project and we'll connect you with a licensed, insured Queens contractor for a free, no-obligation estimate.
Thanks — we'll connect you with a licensed Queens contractor shortly. Keep an eye on your email and phone.